nyc dot traffic standard drawings

APPLICANT INFORMATION (SOLE PROPRIETORSHIP). Chapter 2 describes processes and tools to enhance advance planning and coordination of street work between NYC DOT's own capital resurfacing and reconstruction programs and the street infrastructure work of other stakeholders, especially those that perform a large number of street excavations. The form must be completed and faxed to EAU, which will confirm that the applicant's insurance is current. See, Sidewalks must conform to ADA requirements for a minimum clear-path width and provision of spaces where wheelchair users can pass one another or turn around, Provide an unobstructed clear path of 8 feet or one half the sidewalk width (whichever is greater) in commercial, high-density residential, and transit-adjacent areas, Sidewalks in low-rise residential areas should be at least 5 feet wide, Wherever possible, sidewalk cross-slope should not be greater than 2%, Sidewalks must meet load-bearing, friction, and other requirements per relevant standard specifications and regulations, Color of detectable warning strips on pedestrian ramps should contrast with surrounding pavement: red for, The area within 18 inches of the curb should be kept free of all obstructions, New York City Mayors Executive Order No.22 of 1995 (the Clear Corner Policy) states that to the maximum extent possible, structures and objects should not be placed in the corner quadrant, For recommended clearances between obstructions, see, Include planted areas and stormwater source controls within sidewalks wherever possible when a maintenance partner is identified, If work includes tree planting, consider the location of utility infrastructure, including DEP sewers and water mains, Maximize trees and other green cover wherever clearance allows. DOT Street Lighting's Standard Drawings Book [PDF] includes Standard drawings for elements in the lighting catalogue. Insurance and Permit Bonds After initial registration, active permittees must submit proof of all insurance and bonds annually. Resources | NYC Street Design Manual Resources The following are laws, rules, regulations, and design guidance documents that may be relevant to the design of streets. If the installed canopy fails final inspection, HIQA will reject the canopy maintenance permit and notify the applicant of the rejection. Longitudinal SlopeThe longitudinal slope of the sidewalk must be uniform and parallel to the curb at the curb's proper grade. A VMS BOARD MUST BE PLACED A MINIMUM OF 7 CALENDAR DAYS PRIOR TO CLOSURE WITHIN A LEGAL PARKING SPACE ENTERING THE STREET TO BE CLOSED. New York, NY 10038 A permit is not required to install, repave, reconstruct or repair any sidewalk where the work involves an area of less than 25 square feet, unless the purpose of the work is to remove a violation. The CGL policy should provide coverage in the amount of no less than $1 million combined single limit per occurrence, except for applications for permits to place a crane on a street, which requires $3 million combined single limit per occurrence. 30-30 Thomson Avenue, 4th Floor If the hold is not released, the applicant must contact DDC (DDC contact information is available in Appendix D, Other Agency and Utility Contact Information). 311 (or 212-NEW-YORK outside the City) These are in addition to the "Common Requirements" listed at the beginning of this section. ------- The first option (see Diagram 1) is by using the DOT on-line NYCStreets Permit Management system. The Glossary and definitions found in this Manual provide a brief explanation of NYC DOT terminology. Permit Management & Construction Control Permit by Mail SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. VMS BOARD MUST BE REMOVED UPON COMPLETION OF THE APPROVED CLOSURE. The goal of advance coordination is to reduce the number of excavations in New York City streets. Questions regarding permit registration can be directed to the central Permit Office. DURING CLOSURE SCA MUST SUPERVISE FLAGERS AT EACH INTERSECTION APPROCHING THE WALKWAY CLOSURE DIRECTING PEDESTRIAN TO OPPOSITE SIDEWALK VIA CROSSWALK. This category of permits applies to construction-related activities that take place within the street and are generally associated with construction work adjacent to the street. "Base course" refers to the layer of material below the wearing course. This category of permits applies to authorizations and permits required to place a canopy* over the sidewalk. Abuilding vault, as described in Section 2-13 of the Highway Rules, is any opening below the surface of the street that projects outside of the property line and is covered over, except for those openings: (1) used exclusively to access, by means of steps, the cellar or basement of any building; (2) used primarily for light and ventilation; (3) constructed or maintained by utility companies (including transformer vaults); and (4) which are subways, railroads and related structures. APPROVED PLANS MUST BE ON SITE. A separate permit is required for each street opening activity. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. The second option is available for applicants who do not have the technology to use the above procedure. Tel: 212-720-3480 CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EQUIPMENT, VEHICLES AND PERSONNEL ON OR AROUND WORK SITE. There is one permit application form that covers Street Opening, Building Operations/Construction Activity, and Sidewalk Construction permits for non-governmental work. DESIGNATED AS COBBLESTONE STREET. THIS PERMIT INCLUDES AUTHORIZATION FOR THE STORAGE OF EQUIPMENT (OTHER THAN CRANES) AND MATERIALS ON THE JOB SITE ONLY, INCLUDING JERSEY BARRIERS IF APPLICABLE. THIS STIP IS USED FOR WORK THAT FALLS BETWEEN LANES AND REQUIRES THE CONTRACTOR TO RESTORE THE ROADWAY FROM 1' PAST THEIR RESTORATION TO THE NEAREST CURB FOR THE LENGTH OF THEIR WORK. DOT Street Lighting's, Permeable Interlocking Concrete Paver (PICP), Illuminating Engineering Society of North America. CONSTRUCTION PROJECT INFORMATIONAL SIGN REQUIRED PER DOT HWY RULE SEC 2-02(C) 4 & 5. Fax: (718) 816-9194 Markets, public art, performances, and other events support a vital public realm, increasing pedestrian activity;supporting local businesses;connecting residents with resources;celebrating community, culture, and diversity;and encouraging local ownership of the public spaces in which they occur. Additional requirements are contained in Sections 2-02 and 2-05 of the Highway Rulesand should be consulted before any work is performed on the street. These holds can only be released by OCMC executive staff. Who has exhibited a pattern of disregard for the rules or orders of NYC DOT or the terms or conditions of permits issued by NYC DOT or for other applicable law. THIS PERMIT ACTIVITY MAY NOT START UNTIL THE PERMITTEE COORDINATES ALL WORK WITH ANY ONGOING CONSTRUCTION & WITH THE PROJECT/RESIDENT ENGINEER FOR ANY ONGOING CAPITAL PROJECTS. Homeowners applying for Sidewalk Construction permits who intend to do the work themselves do not need to register. CONTRACTORS WHO AT ANY TIME DURING THEIR PERMITTED WORK ENCOUNTER TRAFFIC SURVEILLANCE CAMERAS, DETECTION EQUIP OR ANY TYPE OF COMMUNICATION EQUIPMENT (WIRELESS OR HARD-WIRED) ON ANY NYCDOT FACILITY, THAT IS NOT INCLUDED ON THE DESIGN/BUILD DWGS, SHALL IMMEDIATELY NOTIFY NYCDOT TRAFFIC MANAGEMENT AT. New York, NY 10013 TO FRI. OTHER TIMES OCCUPY 11 FEET ADJACENT TO SOUTH CURB ONLY. Long Island City, NY 11101 Permits may be voided and reissued only within three business days of issuance. New York City is brimming with construction activityfrom the building of skyscrapers, rehabilitating and reconstructing of bridges and roadways, to the digging of new subway lines. This list is provided as a reference tool, for informational purposes only, and is not an exhaustive list. Further information on responding to CARs may be found in the Highway Rules, Section 2-02(d). Key principles for effective coordination include: Provide Notice of Planned Street work at Earliest OpportunityThe basic principle of providing adequate advance notice is the greater the disruption, the longer the notice period needed. THIS PERMIT REQUIRES REVIEW AND RELEASE FOR SPECIAL TRAFFIC PROJECT RESTORATION. BQE Central Workshops. AS COORDINATED WITH COMMUNITY BOARD, CON ED. Questions regarding permit registration or application processes can be directed to any Permit Office. CGL insurance. All other times: (718) 433-3447, The Bronx and North Queens (north of the Long Island Expressway) By accessing this map portal, a utility company or any other entity that performs street excavation work can find details on NYC DOT projects included in the city's 10-year Capital Budget, as well as more imminent NYC DOT and New York City Department of Environmental Protection capital projects currently in design or under construction. For hearings, Monday to Friday from 8:30 AM to 3:30 PM. Most vault work also requires plan approval and a permit from DOB. A statement of the basic construction details including type, description and color of the canopy covering; type, diameter and gauge of all supporting members; description of the frame, wind bracing assembly and sidewalk and building fastenings; description of proposed lettering on the canopy covering including exact wording and dimensions thereof; three 5 inch by 7 inch photographs of the proposed site. WALKWAY MUST BE RAMPED AT ENTRY TO SIDEWALK FOR HANDICAPPED ACCESSIBILITY. Workers pour cement during sidewalk reconstruction. OCMC will release the hold after it reviews the proposed work and adds the permit stipulations. WORK MAY OCCUR 24 HOURS A DAY, SEVEN DAYS A WEEK. Contact PEU for further information regarding the procedure to obtain initial and final approval for a transformer vault. Work must begin within two hours after obtaining an Emergency Street Opening Permit Number and must be performed around the clock until the emergency is eliminated, unless otherwise directed by NYC DOT. font size. 120-55 Queens Boulevard, Ground Floor, Room G-210 AS A CONDITION OF THIS PERMIT A CONSTRUCTION MANAGER FAMILIAR WITH THIS PROJECT IS REQUIRED TO ATTEND WEEKLY TUESDAY MEETINGS AT 115 BROADWAY 5TH FL OF THE L.M.C.C.C. Permeable Interlocking Concrete Paver (PICP), Provides space for walking, the most widely used mode of travel in New York City, Creates linkages to transit and connects neighborhood destinations, Facilitates straight and unobstructed pedestrian movement, free of vehicle conflicts except at intersections and driveways, With adequate width, can provide space for staying activities such as relaxing, shopping, eating, and socializing, Coordinate streetscape/utility work to minimize street cuts, On both sides of all streets that are 22 feet wide or wider. The Department of Transportation (DOT) maintains and installs New York City parking regulation signs. The hold is to review the proposed work and set conditions for the work and/or restoration. WORK ALLOWED 8 AM TO 4 PM SATURDAY. OFF-SITE STORAGE MUST BE PERMITTED SEPARATELY. APPLICANT SHALL NOT PLACE CONTAINER IN A WAY THAT CONFLICTS WITH OTHER PERMITTED CONSTRUCTION ACTIVITIES ON THE SAME BLOCK. To request release of a CAN hold, the applicant must contact the HIQA borough office in the borough in which the canopy is installed to arrange for a final inspection following canopy installation. Once the canopy installation permit application has been reviewed and approved by the Permit Office, the permit is issued to the canopy installer or authorized agent, and canopy installation can begin. Please visit the Manhattan Office, located at 55 Water Street. CONTRACTOR MUST CALL HIQA BOROUGH OFFICE BEFORE REPLACING COBBLESTONES SO HIQA CAN MONITOR THE REPLACEMENT. WITH NYCDOT MILLING AND PAVING OPERATION. - see, UTILITY COVER EMBARGO 0700-1000 1600-2000 WEEKDAYS, UTILITY COVER EMBARGO 0700-1000 1600-1900 WEEKDAYS, UTILITY COVER EMBARGO/HOLIDAY EMBARGO 0600-2400 WEEKDAYS/WEEKENDS. To request authorization for the installation of a canopy, an applicant must initiate the process at the HIQA office in the borough where the proposed canopy will be located. The first and most expeditious option (see Diagram 2), is by using the DOT on-line NYCStreets Permit Management system. Bridge (BOB) hold Any planned work requiring a Building Operations/ Construction Activity Permit that may potentially be within 100 feet of a bridge structure will be placed on a Bridge hold. Additionally, in the middle of each fiscal year, the New York City Department of Design and Construction (DDC) convenes a meeting with other agencies and utilities to discuss city projects under its purview that are expected to begin construction during the next four years. If the work is more than 100 feet away from the bridge structure, applicants must send a certification by e-mail stating so. DURING WORKING HOURS SIDEWALK MAY BE CLOSED PROVIDED FLAGGERS ARE AT EACH INTERSECTION AND AT BOTH ENDS OF WORK SITE TO SAFELY CROSS PEDESTRIANS. FLAG PERSON MUST BE PROVIDED TO STOP PEDESTRIAN AND/OR VEHICLE TRAFFIC WHILE LIFTING MATERIALS OVERHEAD AND ALSO WHEN CROSSING SIDEWALK IN CONJUCTION WITH CROSSING SIDEWALK PERMITS. WORK 8PM TO 5AM SUNDAY TO FRIDAY MORNING. Outlined below are the basic procedures in applying for a Sidewalk Repair Permit by mail: The New York City Applicants may provide complete copies of insurance policies instead of certificates of insurance. In order to apply for a permit, an applicant must first register in person with NYC DOT by submitting a completed Permittee Registration Application. Office hours: 8:30 AM - 4:30 PM, The Bronx Plumbers*: Enter the plumber's license number and name on license (if applicable). This category of permits applies to openings/excavations or other work in a street that may cause damage to the street surface or to any work that the Permit Office believes would compromise the street surface. MAY BE INTERMITTENTLY CLOSED TO THROUGH TRAFFIC WITH THE USE OF FLAGGERS WHILE PROVIDING LOCAL ACCESS AT ALL TIMES FOR A MAXIMUM OF 90 MINS. * Clear Path (pedestrian walkway): This directive is intended to provide pedestrians with the maximum amount of safety and space to traverse the sidewalk. Office hours: Applications accepted, only from 8:30 AM to 12:30 PM; The citys Climate Resiliency Design Guidelines[PDF] provide guidance on height. IF RENEWED OR REISSUED, THIS PERMIT SHALL NOT BE PLACED ON HOLD. MAY ALSO WORK 7PM TO 11PM WEEK DAYS ONLY FOR THE PURPOSE OF DEP INSPECTION WITH INSPECTOR ON SITE. Thousands of miles of utility pipes, cables and other equipment are beneath the streets of New York City. The private homeowner must complete the application for a.

Asian American Association Utk, Gus Johnson Announcing Schedule, Robert Barker Paleontologist, Articles N

PAGE TOP