~4/. Alteration Type-III is a minor alteration that involves only one type of work, such as a curb cut or a construction fence. In one- and two-family dwellings and townhouses regulated by the Residential Code of New York State, the top sill of the window opening . In order to achieve these purposes, a direct control of density as well as of the physical volume of buildings is established. Plans submitted to DOB shall indicate compliance regarding applicable physical and occupancy standards for dwelling units as required by HMC Subchapter 3, including but not limited to the following table. I couldnt clarify if I, as the Owners rep, who knowingly oversaw a project that required permits, would be personally liable, or if DOB would hold the end user responsible and/or revoke a contractors license. Subway lines, DOT Approval for encroachment to street, DEP Approval for excavation work to increase the ceiling height of basement or cellar apartments, City Planning waiver, approval or certification if required by the Zoning Resolution (ZR), e.g. Plans that are professionally certified do not go through plan review. In NYC an Alteration Type 1 or Alt 1 is a building alteration that requires a new Certificate Of Occupancy. According to Census 2011 information the location code or village code of Nanthan Chedu Extension R F village is 634141. I want to put up walls in a commercial loft space. LL 49 of 2019 1. The Fire-Resistance Rating of building elements shall comply with Table 601, 1968 BC Subchapter 3 Article 14, or 1938 BC Article 4 as applicable. Construction Manager vs. General Contractor Part 6 Logistics, Owner/Vendor Coordination, Construction Manager vs. General Contractor Part 5 Construction, Scheduling & Payments, Construction Manager vs. General Contractor Part 4 Contract, Design & Cost, on "NYC Building Permits What does NB, Alteration Type I, II, III and Directive 14 Mean? Special inspections are a specific subset of all possible inspections. When required by the project scope of work, the Alteration must also comply with the rules, regulations, laws and codes of other city agencies, such as the NYC Fire Department (FDNY), NYC Transportation (DOT), NYC Landmarks Commission, NYC Transit (MTA), Department of Environmental Protection (DEP), and others. Boiler and furnace equipment rooms adjacent to or within Group I-1, I-2, I-4, R-1, R-2 and R-4 occupancies shall be enclosed by 1-hour fireresistance-rated construction. Iowa (/ a w / ()) is a state in the upper Midwestern region of the United States, bordered by the Mississippi River to the east and the Missouri River and Big Sioux River to the west. Per ZR 12-10, a conversion is a change of use between the following categories of uses in the Zoning Resolution: residential, community facility, commercial and manufacturing. Vapor Barriers Prior to obtaining temporary or final certificate of occupancy, a qualified environmental professional shall submit a certification to the department of buildings that a vapor barriers was applied prior to the installation of flooring. City of New York. Aside from following the NYC building codes, you will also need to follow your building rules. The Department Of Buildings (NYC DOB) issues a Certificate Of Occupancy. Alteration Type 3 (Alt-3). Increasing paved, or similarly impermeable areas include waterproofing details as applicable to new unit, Adding or removing any accessory parking spaces, Egress Modifications Any change in the exiting width, length of travel distance, or exit way/exit door location(s), or occupancy load of exits, or any change in number of required exits in a building, Expand scope to add building systems, including any new equipment, Any addition or removal of plumbing, gas or mechanical risers, Any reduction below the minimum number of code required fixtures, Changes to approved plumbing and/or gas fixtures and equipment (See Plumbing Guidelines for more information), Changes to scope of work that require additional Special or Progress Inspection(s). Please let me know. Fire Department Vehicle Access, FC Chapter 5, FAQ Clarifications. Following plan review disapproval, a notice of objections is sent to the Applicant of record and Owner. Smoke and Carbon Monoxide Alarms Basement or cellar apartment shall provide smoke and carbon monoxide alarms complying with BC 907. An Alteration project could be filed for review under either the current Codes, the 2014 NYC Construction Codes, Administrative (AC), Building Code (BC), Plumbing (PC), Fuel Gas (FGC), and Mechanical Codes (MC), or under Prior Codes, such as the 1968 Code, 1938 Code or earlier Codes, depending on the age of the existing building; reference AC Required Documents. Quality Housing Regulations Quality Housing Program, as promulgated by sections ZR 23-15, and ZR 34-11, is mandatory in contextual zones with A, B or X suffices and optional (with exceptions) in other R6-R10 zones and it introduces additional requirements to the provisions for use and bulk ZR 28-00. Chapter 3 Provisions for All Compliance Methods, Chapter 13 Performance Compliance Methods, Appendix A Guidelines for the Seismic Retrofit of Existing Buildings, Appendix B Supplementary Accessibility Requirements for Existing Buildings and Facilities, Appendix C : Guidelines for the Wind Retrofit of Existing Buildings, Resource A Guidelines on Fire Ratings of Archaic Materials and Assemblies, In addition to the provisions of this chapter, work shall comply with all of the requirements of Chapters, Any building having occupied floors more than 75 feet (22 860 mm) above the lowest level of fire department vehicle access shall comply with the requirements of Sections, Where a floor is served by a recirculating air or exhaust system with a capacity greater than 15,000 cubic feet per minute (701 m, Where there is an elevator or elevators for public use, not fewer than one elevator serving the. Refer to ZR Article II, Chapter 3. DOB Tenant Property or Business Owner Codes Code Development NYC Codes Code Notes Reference 2014 Construction Codes Table of Contents GENERAL ADMINISTRATIVE PROVISIONS PLUMBING CODE MECHANICAL CODE FUEL GAS CODE BUILDING CODE An existing building alteration project could be filed under either the current Codes, the 2014 NYC Construction Codes, Administrative (AC), Building (BC), Plumbing (PC), Fuel Gas (FGC), and Mechanical Codes (MC), or under Prior Codes, such as the 1968 Code, 1938 Code or earlier Codes, depending on . The online submission of project application shall occur by completing the intake form with key project information. 2. Potential hazardous material contamination: for excavation or any soil disturbing in a lot with (E) designation, Air quality impacts: for renovation that involves ventilation or exhaust system in a lot with (E) designation, Noise quality impacts: for exterior work in a lot with (E) designation, Energy Analysis on Plans (REScheck: 3 story buildings) (COMcheck:4 stories and above) (Tabular Analysis), Supporting Documentation (window/door schedules with U/SHGC values, exterior envelope details with R values, heating/mechanical systems sizing,efficiency ratings & controls, reflected ceiling plans and lighting legend), Vertical glazing, skylights, door replacement, Lot Line windows replacement or new openings in accordance with permitted percentages, Light and Air calculations for habitable rooms in residential projects, Protection of exposed foundation insulation, Shutoff dampers HVAC insulation and sealing Electrical energy consumption, Interior lighting power Penetrations through thermal envelope: must be sealed to minimize air leakage as per. Value Engineering (VE) Are you designing in value or just cutting costs? We have over 50 years of experience building panelized Timber Frame Homes that can be found all over the nation. Radon Levels Prior to obtaining temporary or final certificate of occupancy, a qualified environmental professional shall submit a certification to the department of buildings that the Radon level in basement or cellar apartment is below 2 picocuries per liter of air. Vice President of Finance & Operations at Mack Weldon. Facility Location. a) sign and seal my architects drawings and file an alteration type2 to the DOB b) obtain a work permit One caveat is if the building is a landmark or in a designated historic district, you may need approval from the NYC Landmarks Preservation Commission (LPC) before undertaking most repair work. The NYC Construction Codes consist of the General Administrative Provisions, Building Code, Plumbing Code, Mechanical Code, Fuel Gas Code, and Energy Conservation Code. %PDF-1.5 % Department of building also have home owners night. It is always recommended to consult with an Expeditor before undertaking any work in case theres something you may have overlooked in your project that might trigger a compliance issue. %%EOF From simple outline map graphics to detailed map of Kab. Would changing a terrace on a large commercial building from a non usable space (maintenance crews only) to a usable space require a change to the Certificate of Occupancy? DOB protocols are complicated and every situation should be assessed on a case by case basis. When submitting the construction documents to DOB, the Registered Design Professional, who is the Applicant of Record, is responsible for submission of complete set at filing: application, drawings, and coordination of required documents as summarized below. Any substantive changes require a PAA; however these changes must be shown on plans and included in the As-built submission at the end of the project (AC 28-104.3). U So if those changes included egress doors being moved, or occupancy classes for spaces, or occupancy calculations in general being modified, then indeed an Alt 1, and therefore updated CofO, would have been required. Temporary Tents and Other Structures COMING SOON! Hi Richard, I have a question. c) in addition they are charging to provide inspections during work, obtain certificate of completion and sign off The Death of the Cubicle, and Other Workplace Trends, Electronic Cigarettes in the Workplace and on the Property. Work that does not result in the issuance of a new Certificate of Occupancy is considered a renovation project. and so on. Exterior Insulation and Finish Systems (EIFS). Approval of an amendment must be obtained before the work is completed. What exactly are these special inspections and do we really need them? ", Choosing a Commercial Real Estate Law Firm. Tenant / Occupant Protection Plan, if applicable, Transit Authority Approval for structural work at properties within 200 feet from any Transit Authority facilities, e.g. hb```f``Ja`e`(`b@ !( g03A$cWVi:dy*r]Si/_Y:@H0JX`$ BBu0Jbdfx +[g If it were, I presume the backup of DOB inspectors and inspections that Directive 14 alleviates would be unmanageable at best. We are the top floor unit in a condo building. Work areas shall be provided with an automatic sprinkler system in accordance with the Building Code of New York State where any of the following conditions exist: 1. An Alteration TypeI Application is required when there is a major change to the Certicate of Occupancy of a building, such as converting it from commercial to residential, an interior . Most fit-outs use an ALT2permit application, which must be filed by a PE or RA. in the Bronx. hXmo8+Dw; Per BC 1704.1.2, the Contractor cannot hire the Special Inspector. Ive had a terrible experience at the dob. There was a two-day a week appointment blackout during the summer of 2010 of Directive 14 applications, but that was a brief disruption and was quickly reinstated. If a building does not have a Certificate Of Occupancy or the Change is in the same use and occupancy group you can apply for a letter of no objection (LNO) to make a change in use. Definitions. A complete submission of drawings should include: All construction documents must be noted as an Alteration per LL 49/2019.Construction drawings that do not indicate clearly participation in this demonstration program will not be reviewed or approved using provisions from LL 49/2019. DOB Plan Review. The change of use within one category is not considered to be a conversion. In addition, portions of the current 2014 NYC Construction Codes (Administrative, Building, Plumbing, Fuel Gas and Mechanical Codes) or Prior Codes, such as the 1968 Code and a few provisions in the 1938 Code, depending on the Code under which the building was constructed, may also be required. Some minor alterations may be done without a work permit. Also refer to Sprinkler Project Guideline. Max 50 Feedlot 10-Line Galvanized Cattle Fence Panel at Tractor Supply Co. Buy OK Brand 10 Line Cattle Panel 16 ft. L x 50 in. Alteration Type-2 Application is an alteration that doesn't change the use or occupancy of the building but requires several types of work, such as plumbing and construction. For detailed information on the ADCIRC model, visit the ADCIRC website . 30 0 obj <> endobj An NYC DOB Alteration Type 2 is when you are doing a renovation and not changing the certificate of occupancy. In most instances, simply replacing a floor does require permitting unless you are changing the egress; cutting away any portion of the floor; modifying any beam or structural support, cutting; and removing or rearranging piping. sprinklers. Directive 14 is specifically related to architects who are self certifying. No special inspections have started and we have since found someone less expensive and recommended by our GC. Where the building is assigned to Seismic Design Category C, D, E or F, 902.1.1 Recirculating Air or Exhaust Systems, Section 903 Building Elements and Materials, 903.1 Existing Shafts and Vertical Openings, 904.1.3 Upholstered Furniture or Mattresses, 904.1.4 Other Required Automatic Sprinkler Systems, [BS] 906.2 Existing Structural Elements Resisting Lateral Loads, [BS] 906.4 Anchorage for Concrete and Masonry Buildings, [BS] 906.5 Anchorage for Unreinforced Masonry Walls, [BS] 906.6 Bracing for Unreinforced Masonry Parapets, [BS] 906.7 Anchorage of Unreinforced Masonry Partitions, Energy Conservation Construction Code of New York State. If the new building is filed as a NB, what about the demo part? Is it possible the special inspections are actually the special enforcement unit of the DOB? Can I file it to make it legal instead of reverting back to original deck? NEWBURGH. It is bordered by six states: Wisconsin to the northeast, Illinois to the east and southeast, Missouri to the south, Nebraska to the west, South Dakota to the northwest, and Minnesota to the north. What is the difference between a Union Shop and Open Shop inConstruction? The site may have a special use permit or use variance from the BSA. 3.2. The DOB now includes random audits of Directive 14, or Alt 2 projects with active permits. endstream endobj startxref *, LICENSING AND REGISTRATION OF BUSINESSES, TRADES AND OCCUPATIONS ENGAGED IN BUILDING WORK, BOILERS, WATER HEATERS AND PRESSURE VESSELS, SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY, GENERAL BUILDING HEIGHTS AND AREAS; SEPARATION OF OCCUPANCIES, GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTER, ENCROACHMENTS INTO THE PUBLIC RIGHT-OF-WAY, SAFEGUARDS DURING CONSTRUCTION OR DEMOLITION, MODIFIED INDUSTRY STANDARDS FOR ELEVATORS AND CONVEYING SYSTEMS, SUPPLEMENTARY REQUIREMENTS FOR ONE- AND TWO-FAMILY DWELLINGS, ASSISTIVE LISTENING SYSTEMS PERFORMANCE STANDARDS, MODIFIED NATIONAL STANDARDS FOR AUTOMATIC SPRINKLER, STANDPIPE, FIRE PUMP, FIRE ALARM, AND SMOKE CONTROL SYSTEMS, ACOUSTICAL TILE AND LAY-IN PANEL CEILING SUSPENSION SYSTEMS, SUPPLEMENTARY FIGURES FOR LUMINOUS EGRESS PATH MARKINGS. Alteration Type 2 (Alt-2). General Construction (GC) formerly Alteration Type 2 & 3 -The most common type of application, this is for the renovation of an existing space with no change to the use, occupancy, or egress. ZR 22-11, ZR 22-12, ZR 12-10, ZR 22-42, and ZR 52-00 ZR 32-00, ZR 23-00 and subsections ZR 33-23 and ZR 33-42, ZR 25-00 and subsections ZR 36-00 and subsections, ZR 23-03, ZR 23-04, ZR 26-41, and ZR 26-42 ZR-33-03. If you are interested in discussing a specific project please contact us directly. Id heard that this was no longer in place? All EIFS applications installed more than 15 feet above adjacent finished grades and alterations to existing EIFS installations more than 15 feet above adjacent finished grades shall be in accordance with BC 1704.13. @o&k8O 9 Work area is defined as that portion or portions of a building consisting of all reconfigured spaces, as indicated in the construction documents. what work cant be done by an owner builder in NYC. NYC Building Permits What does NB, Alteration Type I, II, III and Directive 14 Mean? Drawings indicating excavation, underpinning and/or shoring shall be provided in accordance with BC Section 1814. The exterior door shall have landings on both interior and exterior sides. Jorge Fontan has earned 3 degrees in the study of architecture including two degrees from the City University of New York and a Masters Degree in Advanced Architectural Design from Columbia University. Applications to create or alter a basement or cellar apartment per LL 49/2019 must be submitted as Alteration Type 1. My business parter and I are planning to build out an Industrial space into a community workshop space. The following list, while not all inclusive, are examples of some of the substantive changes that must be submitted for review to amend the approved plans: As-Built Submission. tractorsupply.com 16 ft. x 50 in. The provisions of minimum code requirements in the interior spaces of buildings for ventilation (natural and mechanical), lighting (natural and artificial) and space dimensions (habitable rooms) for 1- and 2-family dwellings, as well as temperature control, sound transmission, surrounding materials and rodent proofing. An alteration which does not require an amended C/O, but includes multiple work types, such as plumbing and construction, is considered an Alt-2. The installation of post-installed mechanical anchors, adhesive anchors, and screw anchors shall comply with Table BC 1704.32. Objections must be resolved through appointments or similarly utilize electronic submissions with the DOB Plan Examination following which the application is approved. Where more than 30 percent of the total floor and roof areas of the building or structure have been or are proposed to be involved in structural alteration within a 5-year period, the evaluation and analysis shall demonstrate that the lateral load-resisting system of the altered building or structure complies with the International Building Code Primary Industry. DOB divides construction alteration into three types. Here are some examples: You will need an architect when filing an alt 2. NYC Department of Buildings: Building Information Search: BIS is not reflecting some transactions made April 29 - May 6, 2022, as well as limited transactions . These are typically associated with specific professionals (MEP Engineers, Structural Engineer, etc) It sounds like the costs go up depending on the number of professionals associated with the inspections. H GALVANIZED, 0060-0 at Tractor Supply Co. Great Customer Service . Alterations where you get a letter of no objection. Mechanical systems requiring a certificate of compliance in accordance with AC 28-116.4.1 shall be inspected for conformance with the approved construction documents as per BC 1704.16. One of those outcomes is a formal DOB-ECB violation. Alarm-initiating and notification appliances shall not be required to be installed in tenant spaces outside of the. In this article we reviewed some of the basics with regards to the difference between and Alt and Alt filing in the NYC DOB. 2023 All Rights Reserved, NYC is a trademark and service mark of the City of New York. The special inspection shall include the verification of compliance with approved construction documents and standards established by the commissioner pursuant to AC 28-113.2.2 of the Administrative Code and BB 2014-018 and BB 2014-019. Furnace rooms protected with an automatic sprinkler system are not required to be enclosed. For example, accessibility, work on mechanical, plumbing, sprinkler, fire protection and/or fuel gas systems, specific building elements such as security grilles, handrails, guards, roofs, etc., and certain kinds of structural work are required to comply with current code provisions. We leased the space in February 2015. Scope of work subject to Office of Environmental Remediation approval (OER): Parking Regulations The purpose of the Zoning Resolution for off-street parking for cars in connection with residences, ZR 25-00, is to provide needed space off the streets for parking in connection with residences, to reduce traffic congestion resulting from the use of streets as places for storage of automobiles, to protect the residential character of neighborhoods, to provide for a higher standard of residential development within the City, and thus to promote and protect public health, safety and general welfare. I was in a similar situation this past summer with a client who also performed ALT 2 work requiring DOB permits, but ultimately didnt want to pay for an architect or MEP, nor wait for drawings, file or pull permits. (Visit http://www.nationalcadstandard.org for more information.). Fire-resistance-rated partitions, floors, ceilings, shafts, and shutters as per BC 110.3.4. *If there is any inconsistency between this provision and LL 49 of 2019, the provision in LL 49 of 2019 shall govern. (E) Designations An (E) designation provides notice of the presence of an environmental requirement pertaining to potential hazardous materials contamination, high ambient noise levels or air emission concerns on a particular tax lot. Via this form, both parties certify that, to the best of their knowledge everything on the forms and drawings are accurate and in compliance with all applicable Code and Laws; and that, in the event that a subsequent audit by the Dept of Buildings results in an objection that requires revisions to the plans and to the physical work, the cost of such changes will be borne by the professional and the building owner. Based on buildings location, designation, and the project scope of work, the following submissions may have to accompany the drawings at intake: HPD documentation for fee waiver, if applicable. Housing Maintenance Code is a New York State Law that establishes the minimum standards for health and safety, fire protection, light and ventilation cleanliness, repair and maintenance and occupancy in all 1- and 2-family dwellings, and which supplements the applicable New York City Construction Codes. Is this the Directive 14 you are talking about in this blog? ***NOTE: Per BC 1103.2.4, Detached one and two-family dwellings, their accessory structures, and their associated sites and facilities are not required to be accessible; however, if accessibility is voluntarily provided, it must comply with the Code. 58 0 obj <>/Filter/FlateDecode/ID[<6C35DDC53B7B6FBB18620E6D8A066CF0>]/Index[30 53]/Info 29 0 R/Length 131/Prev 231756/Root 31 0 R/Size 83/Type/XRef/W[1 3 1]>>stream Alteration: Commercial Office Building COMING SOON! Converting from residential to commercial. . Alteration: Parking Lots and Parking Structures COMING SOON! Sprinkler systems shall be inspected in accordance with BC 903 and BC 1704.23. It is the responsibility of the Registered Design Professional to date the building to determine the applicable codes. channel 2 news buffalo new york Portable Cattle Fence Panels Round OD 38MM 1.8X2.2 Meter For Livestock Farm SS Heat Ex. REFERENCE NOTE: Organizations like the AIA, CSI and National Institute of Building Sciences work jointly to create national standards for consistent documentation and data organization, to assist in communication and coordination across the design and construction industry. Directive 14 1975 authorizes an Architect or Engineer to sign off the construction in place of the Department of Buildings Inspector. Code Revision. An Alteration Type-I Application is required when there is a major change to the Certificate of Occupancy of a building, such as converting it from commercial to residential, an interior conversion of the building or a space within a building, or due to a building addition. Please feel free to post questions or comments below. Hot water boilers operating at pressures of 170 psig (1171 kPa) or less are not required to be enclosed. DOB Tenant Property or Business Owner Industry Safety Codes Code Development NYC Codes Code Notes Reference 2022 Construction Codes Table of Contents GENERAL ADMINISTRATIVE PROVISIONS PLUMBING CODE MECHANICAL CODE FUEL GAS CODE BUILDING CODE Post Approval Amendments. In Group R-2 or R-3 buildings containing dwelling units, the top of the sill of the window opening is at a height less than 36 inches (915 mm) above the finished floor. If you are building a New Building you will File an NB Application. v\X9\rPs~ iF ba>c0@ V7 Perhaps thats what you may have heard? [NY] AJ104.1 Additions, alterations, or renovations. The building has more than enough left over in the FAR to do this. An Alteration Type-II Application may be used when there is no change to the Certificate of Occupancy due to the proposed alterations, such as with an interior fitoutor alteration. Rates for cashing greater checks, other types of checks, and other money orders will vary based on the type and amount of the check and other risk factors. Please note the DOB almost always targets the owner rather than the tenant in such matters. A reduction to an existing buildings floor area that impacts the Certificate of Occupancy -For example, the complete elimination of one or more stories from a building or the demolition of a space. You may also want to get a competitive rates and compare costs to your architects expeditor. HlWI,)?CK@ `eu?C)?~?y1J;G:ukG)lH)sp?s~jO?oy.\qe+SbY>\~smUNU!^Y21v->[|~L}Qo}>e}yA,g%bO;|sl2 /EOh@LhOJsx_ye+-_i$3>R y;&9't?UOHF_a+'E|%ZpHqenU_-!ys&*X-a%^(!R{ q/o>`HI e1E Hi I live in an R3-1 zone. LL 49 of 2019 4.3, 2014 AC 28-315.2, 2014 BC Chapter 9, and Appendix Q, Ceiling Height Radon levels Natural Light Natural Ventilation, LL 49 of 2019 4(i) & (ii) LL49 of 2019 11 LL 49 of 2019 4.7(b) LL 49 of 2019 4.7(a), Subject to applicable provisions of the 2014 BC and 1968 AC 27-600 through AC 27-651, Subject to applicable provisions of the 2014 BC and 1938 AC Article 8, and Article 19, 2014 BC 1601.2, 1805.3, 1814 and 1968 AC 27-580 through 27-724, All one- and two- family residences are R-3, See Construction Equipment Guidelines (Scaffold, Hoists, Chutes, Fences, Sidewalk Sheds, Mechanical Construction Equipment), See Renovation Project Guidelines (Shoring, Excavation, Underpinning of Foundations, and Installation of Ground Structures, Retaining Walls, Flagpoles, Signs and Other Structures), See Building Systems Mechanical Guidelines, See Building Systems Sprinkler Guidelines. An Alteration Type 1 or Alt 1 is an alteration resulting in new or amended Certificate of Occupancy. The expeditor is going to: This means no change to the use, egress, or occupancy. in the midst of them is this Building Code Quick Reference Guide A Schematic Building that can be your partner. When you are doing a building addition that increases the square footage by more than 110% you will follow new building regulations but will not file for a new building permit. What type of Alteration is required to repair entry steps to a home? I have a question. In addition the special inspector has a few items that come up to 8K circa but my architect said that some do not apply to our project. 2022 Construction Codes General Administrative Provisions Building Code Fuel Gas Code Mechanical Code Plumbing Code Use Regulations All two family home types are UG 2, per ZR 22-11. Now my question is, does the landlord have the right to deny me self-certification to begin with? Inspection discrepancies and hazardous conditions shall be reported to the Super-Intendment of construction, as well as to the Site Safety Coordinator or Site Safety Manager, for correction, per BB 2016-006 and 1 RCNY 101-06. Prior to Approval, the Applicant of Record is required to identify all required Special and Progress Inspections (BC 1704.1). In general, if there was a change in use, egress, or occupancy, the alteration application will be an Alt 1 Application which entails a new CofO (as opposed to an Alt 2 for minor alterations which only entails a sign-off). Wet Over Dry Such alterations may be filed for review under the current construction codes or prior codes, as permitted by AC 28-101.4.3. We have two terraces and are planning to build a second bedroom by enclosing a portion of one of them, which sits under an overhang of the roof. Parking requirement waiver. 12/18 DISP CODE DISPOSITION TEXT E1 Complaint Assigned to Building Marshal's Office E2 Complaint Assigned to .
- ホーム
- body found in blackpool today
- 未分類
- nyc building code alteration type 3